Sunday, July 1, 2012

Before and After Photos

A stone wall as our canvas.
A beautiful mural replaces the stone.
The classroom before we work on it.

After our being there, much of the dirt was able to be moved in to allow for the floor to be leveled.

Thanks to those that utilized the hatchets, the walls are now smooth.
With our being there, the construction workers were able to successfully construct a roof for the room.







Thanks to Matt, we are able to see the further improvements to the room.  The room has transformed since we last worked on it. We cannot wait to see the end product!


The outside of the classroom two weeks after we worked on it.
This sidewalk stood between the school and the kindergarten room while we worked.  It is very dangerous to have this crack!
Two weeks after our stay, the sidewalk has been mended!